Contractor placed Post to the end of the bridge for fence.
Cutting in side slopes
removing form work from back walls and drilling in post holes.
Placing the final rip rap around bridge.
cutting in ditches
Drilling holes for post, will set them tomorrow.
No comments:
Post a Comment