Friday, November 16, 2018

Site visit, Roadway and Fencing

 Contractor placed Post to the end of the bridge for fence.

 Cutting in side slopes
 removing form work from back walls and drilling in post holes.
 Placing the final rip rap around bridge.
 cutting in ditches





 Drilling holes for post, will set them tomorrow.

No comments:

Post a Comment