Friday, November 16, 2018

Site visit, Roadway and Fencing

 Contractor placed Post to the end of the bridge for fence.

 Cutting in side slopes
 removing form work from back walls and drilling in post holes.
 Placing the final rip rap around bridge.
 cutting in ditches





 Drilling holes for post, will set them tomorrow.

Friday, November 9, 2018

Site visit, Roadway Compaction

 Contractor was building roadway, compaction was good for the most part. Some areas are soft and will need to be removed and fixed.

 Soft spot
 another place

 Cutting in ditches




 Stopping for the day, will start back up tomorrow.

Wednesday, November 7, 2018

Site visit, pour back walls

 Onsite today to pour the back walls, I checked the steel placement and form work.


 Concrete arrived and I tested it. we poured Bent 1 first.





 Finished bent 1 and moved to Bent 2.


 Both pours went good, made three cylinders for each wall.

Monday, November 5, 2018

Site visit, Check site after rain event

 Site visit to check erosion control after rain event. Erosion control was working good.