Onsite to set Beams, Crane was onsite and getting setup when I arrived.
First beam arrived, all but two was onsite to be set.
All beams are set and all look good, contractor will start drilling and grouting beams.
Wednesday, October 24, 2018
Thursday, October 18, 2018
Site visit, Pour Bent 1 Cap
Onsite to pour Bent 1 cap, looked over form work and steel placement.
All looks good, tested concrete and started pouring bent 1 cap.
Pour went good and I made three cylinders.
All looks good, tested concrete and started pouring bent 1 cap.
Pour went good and I made three cylinders.
Wednesday, October 17, 2018
Site visit, Pour Bent 2 Cap
Onsite to Pour Bent 2 cap, I checked form work and steel placement.
Steel and forms look good, I tested the concrete and we started pouring.
Pour went good, made three cylinders and will be back tomorrow to pour Bent 1 cap.
Friday, October 12, 2018
Site visit, Seating Piling
Onsite today to Seat Piling, Crane was onsite and was getting setup.
Seated Bent 2 piling first, Pile drove some past pre-bore
Finished seating Bent 2 and have to drive crane around to Bent 1
Had to Add to the pad for the crane for Bent 1
Crane is setup and started seating piling
All piling are seated and Bent 1 piling drove past plan as well.
Seated Bent 2 piling first, Pile drove some past pre-bore
Finished seating Bent 2 and have to drive crane around to Bent 1
Had to Add to the pad for the crane for Bent 1
Crane is setup and started seating piling
All piling are seated and Bent 1 piling drove past plan as well.
Wednesday, October 10, 2018
Site visit, Day Two Pre-Bore
Day two has started,
Drilling is going good.
Finished drilling and contractor started placing piling and gravel in holes
Will be back to seat piling.
Drilling is going good.
Finished drilling and contractor started placing piling and gravel in holes
Will be back to seat piling.